Construction of new additions and renovations to the existing student health center. Detailed planning and scheduling were necessary to make sure that every avenue of expediency was being considered. As a result, construction was completed on time under an extremely tight schedule.
The scope included:
- New elevator installed in existing facility
- Extensive detailing in both the exterior brick and interior millwork
- Circular staircase
- Balcony
- Cupola