The Hill School – Lehrman Pavilion
Construction of a new pavilion located in the center of the campus sports complex included: Split face block and James Hardie Trim exterior façade Circular atrium indoor and outdoor seating
Construction of a new pavilion located in the center of the campus sports complex included: Split face block and James Hardie Trim exterior façade Circular atrium indoor and outdoor seating
Construction of a state-of-the art performance facility included the following: 720-seat auditorium Art rooms Private practice rooms Group practice rooms Classrooms Cantilevered sound and lighting booths Projection booth Theatrical lighting
Construction of new four-story academic building on occupied university campus included: 25 classrooms Three seminar rooms 129-seat lecture hall Two computer labs Language lab Seven resource rooms 100 offices for
Construction of a sustainable educational solar facility included: 16 solar panels An interactive pavilion housing the solar inverters, batteries and other equipment Vegetated roof Recycled materials Regionally manufactured materials Wohlsen
Preconstruction and construction services for the new building housing the mechanical systems and equipment needed for the integration of natural gas and hot and chilled water systems across campus. The
Preconstruction and construction management services for the addition and renovations to the university dining hall. The work included a 4,800 sq. ft. addition to the Lottie Nelson Dining Hall adding
Preconstruction and construction services for the additions and renovations to the Sollenberger Sports Complex including: 20,000 sq. ft. fitness center addition with free weight and cardio areas and group fitness
Renovation of an abandoned warehouse and contaminated/brownfield site to a new medical facility that provides health care services to individuals regardless of their financial and insurance status. Design-build construction services
Renovation of an existing facility that was half-occupied and operational. A second floor was constructed within the space to create additional office space. The first floor houses a pediatric facility,
Addition and renovation of an existing two-story office building into a state-of-the-art medical office building. The new facility includes: New Front Addition Canopy Elevator Vestibule First Floor MRI CT LINAC
Preconstruction and construction management services for two new independent living buildings; renovations and additions to an existing, occupied continuing care retirement community; and extensive site work and state highway entrance